GS1 / EPC
RAIN RFID × GS1 / EPC | Identification architecture
Treat EPC not as tag data alone, but as an identification architecture for inter-company, international and long-term operations.
KEY DESIGN POINTS
Key design points
01
Clarify the roles of SGTIN, TID and in-house IDs
02
Design integration through EPCIS and Digital Link
03
Migrate barcode, master data and RFID in controlled stages
RELATED
Related Resources & LABS
TECHNOLOGY GUIDES